What it is
The NTS entry capacity (gas) charge in plain English
Charge for gas entering the National Transmission System at entry points (terminals, interconnectors, LNG). A volumetric pass-through to all gas consumers.
Introduced 1996 (gas market liberalisation). Reformed under UNC charging methodology.
Who charges it
The body that sets the rate
National Gas Transmission under Ofgem's RIIO-GT3 price control (from April 2026)
Unit
p/kWh
Applies to
All gas supplies
What it pays for
Where the revenue ends up
National high-pressure gas transmission network (NTS), 7,660km of pipelines
Published rate history
| Financial year | Rate | Year on year | Source |
|---|---|---|---|
| 2020/21 | 0.00950p/kWh | - | Published |
| 2021/22 | 0.0100p/kWh | +5.3% | Published |
| 2022/23 | 0.0105p/kWh | +5.0% | Published |
| 2023/24 | 0.0112p/kWh | +6.7% | Published |
| 2024/25 | 0.0118p/kWh | +5.4% | Published |
Forecast trajectory
Forecasts from our non-commodity cost model. P10, P50 and P90 are the 10th, 50th and 90th percentile outcomes; P50 is the central estimate.
| Year | P10 | P50 | P90 | Confidence | Rationale |
|---|---|---|---|---|---|
| 2025 | - | 0.0122 | - | - | |
| 2026 | - | 0.0124 | - | - | |
| 2026-27 | 0.0180 | 0.0192 | 0.0205 | high | RIIO-GT3 draft determinations provide regulatory clarity for allowed revenues and charging methodology changes. |
| 2027 | - | 0.0127 | - | - | |
| 2027-28 | 0.0195 | 0.0215 | 0.0240 | high | Gas demand decline patterns well-established, regulatory framework stable under RIIO-GT3. |
| 2028 | - | 0.0129 | - | - | |
| 2028-29 | 0.0225 | 0.0254 | 0.0290 | med | Heat pump deployment and industrial decarbonisation policies create demand uncertainty. |
| 2029 | - | 0.0132 | - | - | |
| 2029-30 | 0.0250 | 0.0296 | 0.0350 | med | Compound effects of volume decline and potential network investment requirements increase uncertainty. |
| 2030 | - | 0.0135 | - | - | |
| 2030-31 | 0.0240 | 0.0348 | 0.0430 | med | End of RIIO-GT3 period with significant regulatory and demand uncertainties for following period. |
| 2031 | - | 0.0138 | - | - | |
| 2031-32 | 0.0250 | 0.0351 | 0.0450 | low | No regulatory determinations beyond RIIO-GT3, hydrogen network development uncertainty. |
| 2032 | - | 0.0140 | - | - | |
| 2032-33 | 0.0240 | 0.0355 | 0.0470 | low | Fundamental uncertainty about network utilisation and hydrogen blending impacts. |
| 2033 | - | 0.0143 | - | - | |
| 2033-34 | 0.0220 | 0.0320 | 0.0450 | low | Weak consensus across analytical runs, potential for alternative cost recovery mechanisms. |
| 2034 | - | 0.0146 | - | - | |
| 2034-35 | 0.0200 | 0.0294 | 0.0420 | low | Speculative estimate due to unknown regulatory frameworks and potential network access arrangements. |
NTS entry capacity (gas) FAQs
What is the NTS entry capacity (gas) charge?
Charge for gas entering the National Transmission System at entry points (terminals, interconnectors, LNG). A volumetric pass-through to all gas consumers.
Who sets the NTS entry capacity (gas) rate?
The NTS entry capacity (gas) rate is set by National Gas Transmission under Ofgem's RIIO-GT3 price control (from April 2026).
What does NTS entry capacity (gas) pay for?
NTS entry capacity (gas) revenue supports National high-pressure gas transmission network (NTS), 7,660km of pipelines.
What is the latest published NTS entry capacity (gas) rate?
For 2024/25, the published NTS entry capacity (gas) rate is 0.0118 p/kWh.
What is the NTS entry capacity (gas) forecast?
Our latest forecast for 2025 is 0.0122 p/kWh.
Related charges in Transmission
Calculate your NTS entry capacity (gas) exposure
Enter an MPAN or postcode plus kWh/kVA to see NTS entry capacity (gas) alongside every other non-commodity line item for this year and next.
Flexible contracts and pass-through costs
How we manage non-commodity exposure for I&C buyers who need to stress-test contract decisions.
All UK energy charges
Browse every non-commodity charge with the latest published rates and forecast trajectory.
Rate data from the Purely Energy non-commodity cost data hub (dh.purelyenergy.co.uk). Published rates come from statutory publications by the body listed above; forecasts are modelled from published guidance and market trends, so treat P50 as a central estimate and use P10/P90 for sensitivity. Primary source