Skip to main content

UK non-commodity charge · Transmission · Electricity

TNUoS demand charge (half-hourly)

Latest published rate, who sets it, and where it is forecast to go.

What TNUoS demand charge (half-hourly) is, who sets the rate, what the revenue funds and where it is heading. Rates come from the Purely Energy non-commodity cost data hub; forecasts are our own.

Latest published rate
2.927GBP/kW
2026/27-1.6% vs 2025/26
Forecast
0.0776GBP/kW
2027-28 · low confidence-97.3%
Share of bill
Not estimated
Varies too much by site to give a typical share
Set by
NESO (National Energy System Operator)
Half-hourly metered electricity supplies

TNUoS demand charge (half-hourly): what it is, who charges it, and what it pays for

What it is

The TNUoS demand charge (half-hourly) charge in plain English

Locational transmission demand charge for half-hourly metered sites, set per TNUoS zone in pounds per kW of average demand across the three winter peak half-hours (the Triads, November to February). Since the Targeted Charging Review took effect in April 2023 the larger residual element of TNUoS is recovered through fixed daily TDR bands instead, so this locational element is now the smaller part of the transmission charge for most sites.

Introduced 1990 (privatisation). Reduced importance since TCR reform in 2023.

Who charges it

The body that sets the rate

NESO (National Energy System Operator)

Unit

GBP/kW

Applies to

Half-hourly metered electricity supplies

What it pays for

Where the revenue ends up

National high-voltage transmission network (275kV/400kV pylons and cables)

Published rate history

Financial yearRateYear on yearSource
2020/2148.002GBP/kW-Published
2021/2249.337GBP/kW+2.8%Published
2022/2353.092GBP/kW+7.6%Published
2023/242.161GBP/kW-95.9%Published
2024/252.312GBP/kW+7.0%Published
2025/262.975GBP/kW+28.7%Published
2026/272.927GBP/kW-1.6%Published

Forecast trajectory

Forecasts from our non-commodity cost model. P10, P50 and P90 are the 10th, 50th and 90th percentile outcomes; P50 is the central estimate.

YearP10P50P90ConfidenceRationale
2026-270.06700.07460.0820medRIIO-T3 transition effects create moderate uncertainty around methodology changes
2027-3.663--
2027-280.06980.07760.1120lowWide confidence interval reflects RIIO-T3 implementation uncertainty and potential CUSC modifications
2028-3.080--
2028-290.07500.08350.0980medMid-price control period provides greater certainty as transmission capex accelerates
2029-4.650--
2029-300.10500.12090.1350medAligns with published NESO forecasts, reflecting transmission investment for net zero
2030-4.499--
2030-310.08500.10140.1200lowDivergent analyst opinions on allocation between TRIAD and residual charges
2031-4.589--
2031-320.09000.11060.1350lowHighly speculative given lack of regulatory clarity around RIIO-T4 frameworks
2032-4.681--
2032-330.09500.12060.1500lowContingent on future regulatory frameworks, should be treated as speculative
2033-4.775--
2033-340.10000.13030.1650lowAssumes continued transmission investment trajectory but methodology could change
2034-4.870--
2034-350.10500.13810.1750lowHighly speculative estimate contingent on unknown RIIO-T4 parameters

TNUoS demand charge (half-hourly) FAQs

What is the TNUoS demand charge (half-hourly) charge?

Locational transmission demand charge for half-hourly metered sites, set per TNUoS zone in pounds per kW of average demand across the three winter peak half-hours (the Triads, November to February). Since the Targeted Charging Review took effect in April 2023 the larger residual element of TNUoS is recovered through fixed daily TDR bands instead, so this locational element is now the smaller part of the transmission charge for most sites.

Who sets the TNUoS demand charge (half-hourly) rate?

The TNUoS demand charge (half-hourly) rate is set by NESO (National Energy System Operator).

What does TNUoS demand charge (half-hourly) pay for?

TNUoS demand charge (half-hourly) revenue supports National high-voltage transmission network (275kV/400kV pylons and cables).

What is the latest published TNUoS demand charge (half-hourly) rate?

For 2026/27, the published TNUoS demand charge (half-hourly) rate is 2.927 GBP/kW.

What is the TNUoS demand charge (half-hourly) forecast?

Our latest forecast for 2027-28 is 0.0776 GBP/kW (low confidence). Wide confidence interval reflects RIIO-T3 implementation uncertainty and potential CUSC modifications

Related charges in Transmission

Rate data from the Purely Energy non-commodity cost data hub (dh.purelyenergy.co.uk). Published rates come from statutory publications by the body listed above; forecasts are modelled from published guidance and market trends, so treat P50 as a central estimate and use P10/P90 for sensitivity. Primary source