QatarEnergy extends Edison LNG force majeure, 35 cargoes now undelivered
Published 29 September 2026
QatarEnergy has extended force majeure notices on LNG deliveries to Italy's Edison until early December, taking the total number of undelivered cargoes to 35 as the Strait of Hormuz disruption drags into its sixth month.
QatarEnergy has extended force majeure declarations covering LNG shipments to Italian utility Edison and Asian buyers, Reuters reported on Monday, citing Edison and trading sources. The extension pushes Edison's missed deliveries out to early December, taking the total number of undelivered cargoes to 35, after Edison flagged on an Italian energy markets platform that a further six shipments had been cancelled. Bangladesh and Pakistan have separately been told their force majeure cover now runs to November.
The root cause remains the closure of the Strait of Hormuz following the US-Iran conflict, first cited when QatarEnergy declared force majeure in April. Reuters data shows the scale of the disruption: Qatar managed only 18 LNG shipments by the end of August, against 509 in the same period last year, a fall of 96% in export volumes. Edison's contract with QatarEnergy covers 6.4 billion cubic metres a year, roughly 10% of Italy's total gas consumption, under a deal running since 2009 across 25 years. Edison's French parent, EDF Italia, has already replaced 23 of the missing cargoes, largely with US-sourced LNG.
What this means for UK buyers
NBP day-ahead prices over the past year give a sense of how much headroom remains for the curve to firm further as European buyers compete for scarce LNG cargoes.
Wholesale market chart
NBP day-ahead gas
Last 7 days, settlement data
179.3p/therm
−6.4% over 7 days
Why this window: Last 7 days — 9.3% range, 6.4% net move lower. Tight window picked so the week's price action is visible.
The UK does not hold a direct contract with QatarEnergy, but the mechanism matters for any business exposed to winter gas pricing. Qatari volumes normally displace demand that European buyers would otherwise pull from the Atlantic Basin and US Gulf Coast; with that supply absent, Italy, Germany, and other EU states are competing harder for the same LNG cargoes UK suppliers also draw on to balance National Balancing Point (NBP) gas. That competition tends to firm the wholesale gas curve well before UK-specific weather or demand shifts show up.
- Edison's 35 undelivered cargoes, replaced mainly with US LNG
- Qatari export volumes down 96% year-on-year to 18 shipments by end-August
- Force majeure to Bangladesh and Pakistan extended to November
- Germany still working to fill storage ahead of winter, Italy closer to its EU buffer target
- EDF Italia's 23 replacement cargoes adding to global LNG demand
Italy says it remains on track to meet its EU gas storage buffer targets, but Germany's more urgent fill programme signals the tightness is not isolated to one market. For UK buyers on flexible or index-linked contracts, that broader European scramble for LNG is the more relevant transmission channel than the Edison contract itself. Fixed-term renewals due over the winter should factor in a curve that is firming on supply-side news rather than domestic demand.
The next marker to watch is whether QatarEnergy extends force majeure again beyond early December, and whether the Strait of Hormuz situation shows any sign of easing; either would move the calculus for how much LNG Europe, and by extension the UK, can expect through the first quarter of next year.
How we produced this article
This article was AI-drafted from public market reporting by Harvey Rowlinson on 29 September 2026. It is scheduled for its next review on 29 September 2027.
Sources
- Qatar prolongs force majeure notifications regarding LNG supply to Edison., Reuters (accessed 29 September 2026) (subscription required)
- Qatar Extends LNG Force Majeure as Hormuz Disruptions Drag On, Bloomberg (accessed 29 September 2026) (subscription required)
Read our editorial standards and corrections policy.